|
|
|
|
Donald J. Trump: "Excitingly, the final coat of protection will be completed on the Reflecting...
发布时间:June 3, 2026, 3:12 PM
Excitingly, the final coat of protection will be completed on the Reflecting Pool that sits between The Washington Monument and The Lincoln Memorial, at 4 P.M., today. The water will start flowing, shortly thereafter. The walking paths outside of the Pool will, likewise, be cleaned, sandblasted, and finished soon. This will be the first time since the day it was built, 1922, that it has worked, and worked wonderfully, indeed!
---
**中文翻译:**
令人兴奋的是,位于华盛顿纪念碑和林肯纪念堂之间的倒影池的最后一层保护层将于今天下午 4 点完成。此后不久,水就会开始流动。同样,泳池外的步行道也将很快进行清洁、喷砂和完工。这将是自 1922 年建成以来第一次发挥作用,而且效果非常好!

原文链接:https://trumpstruth.org/statuses/39069
本文由自动抓取系统生成,英文原文已自动翻译为中文。 |
本站资源免费共享,所发布的一切资源均收集于互联网用户公开分享,本站不对资源拥有任何版权,版权争议与本站无关,您必须在学习后的24个小时之内,从您的设备中彻底删除上述内容。
1. 本站不对资源进行任何的制作和改造,仅限用于学习和研究目的;
2. 您不得将上述内容用于商业或者非法用途,否则,一切后果请用户自负;
3. 本站内容如侵犯了您的合法权益,请及时留言,以便本站及时清理;
4. 本站作者QQ:41020712,可免费下载!
5. 盗版,破解有损他人权益和违法作为,请各位用户支持正版!
|